Blowout Preventers, Shaffer Blowout Preventers, Cameron Blowout Preventers, BOP Stack

Well Testing BOP

When the wireline and/or the cable are run into the natural flow oil/gas well or the waterflood well, the well testing blowout preventer (BOP) can seal the wellhead. The wellhead sealing system for wireline operation is complicated. Therefore, it is necessary to inject the grease into the sealing system.

Main Technical Parameters of Cable BOP

Max. working pressure

MPa
Blowout pipe ID

mm (in)
Cable diameter

mm (in)
35 38.1(11/2)  50.9(21/6) 4.7625 (3/16)

5.5563(7/32)

6.23(1/4)

12.7(1/2)
63.5(21/2)  74.6(215/16)
90.5(39/16)  127(5)
171.5 (63/4")
70 50.9(21/6)

63.5(21/2)

76.2 (3)

101.6 (4)
105

Main Technical Parameters of Wireline BOP:

Max. working pressure

MPa
Blowout pipe ID

mm (in)
Wireline

diameter mm
35 38.1(11/2) 50.9(21/6) 1.8
63.5(21/2) 74.6(215/16) 2.0
90.5(39/16) 127(5) 2.2
171.5(63/4) 2.4
70 50.9(21/6) 1.8
63.5(21/2) 2.0
105 76.2 (3) 2.2
101.6 (4) 2.4

Blowout Preventers